Baptist Health Hardin

Project Summary

The project will include a five-level building to be constructed west of Woodland Avenue, south of Long Avenue, and north of Patriot Parkway (Woodland Avenue will be closed). The first level will be partially below grade, but attached to the main hospital’s first floor. The first level will house the surgery areas, materials management, shelled space for future food service expansion, and the central energy plant. Surgery will include: three cardiac catheterization procedure rooms, twelve operating rooms (including one hybrid operating room), associated support spaces for the surgery including registration, waiting, prep/recovery, and central sterile processing. Materials management will have a truck court with a loading dock. The Central Energy Plant will include boilers, chillers, and emergency generators for the entire hospital; the hospital is investigating using geothermal energy to save money and be more sustainable. The second level will be the primary entry level, and adjacent to the parking lot. It will include the first level of the cancer center with radiation therapy (one shelled) and treatment planning. The fifth level will be shelled-in for future clinic growth.

Client

Location

Project

Industry

Get Started

Contact Us to Begin Your Next Project

LOUISVILLE
613 W MAIN STREET
LOUISVILLE, KY 40202
502-893-1875

LEXINGTON
501 E HIGH STREET
LEXINGTON, KY 40502
859-402-8008